Location
1071 Fifth Avenue

Completion
2008

Client
Solomon R. Guggenheim Museum

Square Footage
80,000 SF

Architect
WASA

Engineer
Robert Silman Associates

Guggenheim Museum - Exterior Restoration / MEP Upgrade

Sciame was the Construction Manager responsible for the exterior restoration of the Guggenheim Museum. For the five decades that the museum has been standing, exterior maintenance has consisted mostly of painting. In March 2005, sensors were placed on the building’s exterior to measure contraction and expansion. Detailed monitoring of the movement of selected cracks, laser surveys, and other studies were used by the restoration team to formulate an appropriate methodology to repair the cracks and ensure the building’s long-term health. In December 2005, the paint was stripped off to reveal the concrete walls underneath: approximately 80,000 SF of wall surface.

The goal was the full exterior restoration of the museum – including the waterproofing of the exterior, patching and painting, hidden structural stabilization, replication of original windows and skylights to improve thermal and conservation needs, and extensive mechanical system upgrades for the museum environment – all this work was accomplished while the museum remained open to the public.

The major construction challenge at the Guggenheim was the careful planning required which allowed the Museum’s gallery and office space to remain 100% operational throughout the duration of the project. Sciame’s team closely coordinated all interior and exterior work with the Museum team, so that normal operations could continue while the full restoration efforts were completed.

Project Awards

April 24, 2019

The Preservation League of New York State
Excellence in Historic Preservation Award

April 24, 2019

American Council of Engineering Companies (ACEC) New York
Engineering Excellence Platinum Award

April 24, 2019

New York Landmarks Conservancy
Lucy G. Moses Preservation Award

April 24, 2019

International Concrete Repair Institute (ICRI)
Award of Excellence for Repair of Low Rise Structures

April 24, 2019

Structural Engineers Association of New York (SEAoNY)
Distinction in Structural Engineering Award

We at Sciame Construction are thrilled to extend our heartfelt gratitude to our amazing staff who not only cheered on but also fearlessly accepted and triumphantly completed the 3.5-mile J.P. Morgan Corporate Challenge. Thank you once again for your participation and support. #jpmcc ...

132 2

The Perelman Performing Arts Center will provide versatile layouts across three theater spaces, which can be combined to offer a range of seating configurations. Additionally, the venue will feature a lobby level complete with a bar, café, terrace, and stage.

@rexarchitecture @davisbrodybond @silman.structural @brookfieldproperties @theportauthority_ny_nj @cimolai_group @stonebridgeerectors @jarosbaumbolles @mka_inc @long_island_concrete @granoguli

#ronaldoperelmanperformingartscenter #construction #nyc #wtc #menatwork #downtown #wip #jobsite #facade
...

212 5

Dramatic footage of a facade panel being lifted into place and installed at The Studio Museum in Harlem (@studiomuseum).

Architects: @adjayeassociates @cooperrobertsonpartners

📹: @aaronthompsonphoto

#wip #underconstruction #harlem #museum #facade #installation
...

130 2
This error message is only visible to WordPress admins
Error: There are no business accounts connected.