Location
199 Water Street

Completion
2013

Client
Resnick and Sons

Square Footage
20,000 SF

Design Architect
Swanke Hayden Connell Architects

199 Water Street Lobby Renovation

Sciame was the Construction Manager responsible for the construction and renovation of the existing 20,000 SF lobby, including interior and exterior lighting upgrades, installation of new turnstiles, new security and mail room construction, renovation of the lobby desk and updated signage throughout the lobby.

If you see a crowd staring at the sky, don’t panic, they’re just admiring Fifth Avenue’s ultimate accessory, Stacked Trunks, brought to you by Louis Vuitton. ...

186 9

We at Sciame Construction are thrilled to extend our heartfelt gratitude to our amazing staff who not only cheered on but also fearlessly accepted and triumphantly completed the 3.5-mile J.P. Morgan Corporate Challenge. Thank you once again for your participation and support. #jpmcc ...

132 2

The Perelman Performing Arts Center will provide versatile layouts across three theater spaces, which can be combined to offer a range of seating configurations. Additionally, the venue will feature a lobby level complete with a bar, café, terrace, and stage.

@rexarchitecture @davisbrodybond @silman.structural @brookfieldproperties @theportauthority_ny_nj @cimolai_group @stonebridgeerectors @jarosbaumbolles @mka_inc @long_island_concrete @granoguli

#ronaldoperelmanperformingartscenter #construction #nyc #wtc #menatwork #downtown #wip #jobsite #facade
...

212 5

Dramatic footage of a facade panel being lifted into place and installed at The Studio Museum in Harlem (@studiomuseum).

Architects: @adjayeassociates @cooperrobertsonpartners

📹: @aaronthompsonphoto

#wip #underconstruction #harlem #museum #facade #installation
...

130 2