Location
433 West End Avenue

Completion
2004

Client
Calhoun School

Square Footage
30,000 SF

Architect
FXCollaborative

Calhoun School

Sciame was the Construction Manager responsible for the two-phased renovation and addition above the existing school. Phase I included a 6,000 SF extension at the back of school and structural / MEP provisions for Phase II. In addition, Phase II also required 3 new floors over the existing roof. The Calhoun school remained operational during all construction phases.

We at Sciame Construction are thrilled to extend our heartfelt gratitude to our amazing staff who not only cheered on but also fearlessly accepted and triumphantly completed the 3.5-mile J.P. Morgan Corporate Challenge. Thank you once again for your participation and support. #jpmcc ...

The Perelman Performing Arts Center will provide versatile layouts across three theater spaces, which can be combined to offer a range of seating configurations. Additionally, the venue will feature a lobby level complete with a bar, café, terrace, and stage.

@rexarchitecture @davisbrodybond @silman.structural @brookfieldproperties @theportauthority_ny_nj @cimolai_group @stonebridgeerectors @jarosbaumbolles @mka_inc @long_island_concrete @granoguli

#ronaldoperelmanperformingartscenter #construction #nyc #wtc #menatwork #downtown #wip #jobsite #facade
...

Dramatic footage of a facade panel being lifted into place and installed at The Studio Museum in Harlem (@studiomuseum).

Architects: @adjayeassociates @cooperrobertsonpartners

📹: @aaronthompsonphoto

#wip #underconstruction #harlem #museum #facade #installation
...

This error message is only visible to WordPress admins
Error: No users set.