Location
Times Square

Completion
2001

Client
New 42nd Street, Inc.

Square Footage
80,000 SF / 11 Stories

Architect
Platt Byard Dovell Architects

New 42 Studio Building

Sciame was the Construction Manager responsible for the construction of the New 42nd Street Studio. The building houses fourteen rehearsal studios for dance, music and theater, a 199-seat black box theater, ground floor retail space, and 20,000 SF of office space for performing arts groups, including the Roundabout Theatre Company and the Williamstown Theater Festival. The space also serves as the new headquarters for the non-profit New 42nd Street, Inc. organization.

The building was designed to express the activities that take place within. The structure incorporates ceiling heights of 13’ or more in rehearsal spaces that are stacked in the aluminum and glass curtain wall tower, supported by a brick-clad service core housing elevators, stairs, plumbing, and HVAC. The building integrates a unique prismatic lighting guide provided by a 175-foot vertical light spire on the west side of the building, which allows the building’s colors to be manipulated.

A number of construction challenges were posed due to the building’s location in the heart of Times Square: first, access to the site was limited to 42nd Street during restricted hours because of bus lane requirements; second, a 10’ wide pedestrian passageway complicated by a very tight space which had to accommodate an outside hoist as well as staging materials had to be maintained for Empire Development Corporation requirements; and finally, underpinning of the site was required along the adjacent historic New Victory Theater.

Project Awards

April 24, 2019

The American Institute of Steel Construction
Merit Award

We at Sciame Construction are thrilled to extend our heartfelt gratitude to our amazing staff who not only cheered on but also fearlessly accepted and triumphantly completed the 3.5-mile J.P. Morgan Corporate Challenge. Thank you once again for your participation and support. #jpmcc ...

The Perelman Performing Arts Center will provide versatile layouts across three theater spaces, which can be combined to offer a range of seating configurations. Additionally, the venue will feature a lobby level complete with a bar, café, terrace, and stage.

@rexarchitecture @davisbrodybond @silman.structural @brookfieldproperties @theportauthority_ny_nj @cimolai_group @stonebridgeerectors @jarosbaumbolles @mka_inc @long_island_concrete @granoguli

#ronaldoperelmanperformingartscenter #construction #nyc #wtc #menatwork #downtown #wip #jobsite #facade
...

Dramatic footage of a facade panel being lifted into place and installed at The Studio Museum in Harlem (@studiomuseum).

Architects: @adjayeassociates @cooperrobertsonpartners

📹: @aaronthompsonphoto

#wip #underconstruction #harlem #museum #facade #installation
...

This error message is only visible to WordPress admins
Error: No users set.