Location
433 West End Avenue
Completion
2004
Client
Calhoun School
Square Footage
30,000 SF
Architect
FXCollaborative
Location
433 West End Avenue
Completion
2004
Client
Calhoun School
Square Footage
30,000 SF
Architect
FXCollaborative
Sciame was the Construction Manager responsible for the two-phased renovation and addition above the existing school. Phase I included a 6,000 SF extension at the back of school and structural / MEP provisions for Phase II. In addition, Phase II also required 3 new floors over the existing roof. The Calhoun school remained operational during all construction phases.
The New Victory Theater – Originally built in 1900 as The Republic, the first performing arts venue on 42nd Street, the theater was transformed into The New Victory in 1995, becoming New York’s first theater for children and families. The renovation uncovered and restored original architectural elements, added a new lobby carved from the existing structure and bedrock, rebuilt the historic staircase, and created space for much-needed restrooms. A rear wing was added for backstage access, dressing rooms, workshops, and a loading dock, while new elevators and rooftop HVAC systems were integrated to meet modern needs of the historic theater.
We’re turning 50! As we count down to Sciame’s 50th anniversary on June 13th, we’re celebrating the moments that shaped us. For the next 50 days, we’ll be sharing one standout project a day in our “Countdown to 50”.
Thank you to our amazing clients, team, and friends! We wouldn’t be here without you.
Sciame is honored to have served as the construction manager for the expansion and refurbishment of The Frick Collection, working alongside Selldorf Architects and Beyer Blinder Belle to bring this vision to life. As the museum prepares to reopen next month, we’re pleased to see this project receive high praise in The New York Times from esteemed architecture critic Michael Kimmelman.
🔗 Click the link in our bio to read more.
📰: The New York Times
📸: by Lila Barth