Location
435 West 116th Street

Completion
2009

Client
Columbia University Dept. of Capital Project Management

Square Footage
18,000 SF

Architect
Paul Segal Architects

Columbia University - Jerome Greene Hall

Sciame was the Construction Manager responsible for the modifications to the existing 10 story Jerome Greene Hall building, originally constructed in 1956, raising the roof an additional floor to create 10,000 SF of new interior office space. Sciame also installed new HVAC equipment on the roof to replace the existing equipment serving the entire building. All work was performed while the building was fully occupied.

If you see a crowd staring at the sky, don’t panic, they’re just admiring Fifth Avenue’s ultimate accessory, Stacked Trunks, brought to you by Louis Vuitton. ...

186 9

We at Sciame Construction are thrilled to extend our heartfelt gratitude to our amazing staff who not only cheered on but also fearlessly accepted and triumphantly completed the 3.5-mile J.P. Morgan Corporate Challenge. Thank you once again for your participation and support. #jpmcc ...

132 2

The Perelman Performing Arts Center will provide versatile layouts across three theater spaces, which can be combined to offer a range of seating configurations. Additionally, the venue will feature a lobby level complete with a bar, café, terrace, and stage.

@rexarchitecture @davisbrodybond @silman.structural @brookfieldproperties @theportauthority_ny_nj @cimolai_group @stonebridgeerectors @jarosbaumbolles @mka_inc @long_island_concrete @granoguli

#ronaldoperelmanperformingartscenter #construction #nyc #wtc #menatwork #downtown #wip #jobsite #facade
...

212 5

Dramatic footage of a facade panel being lifted into place and installed at The Studio Museum in Harlem (@studiomuseum).

Architects: @adjayeassociates @cooperrobertsonpartners

📹: @aaronthompsonphoto

#wip #underconstruction #harlem #museum #facade #installation
...

130 2