Location
199 Water Street

Completion
2013

Client
Resnick and Sons

Square Footage
20,000 SF

Design Architect
Swanke Hayden Connell Architects

199 Water Street Lobby Renovation

Sciame was the Construction Manager responsible for the construction and renovation of the existing 20,000 SF lobby, including interior and exterior lighting upgrades, installation of new turnstiles, new security and mail room construction, renovation of the lobby desk and updated signage throughout the lobby.

The Perelman Performing Arts Center will provide versatile layouts across three theater spaces, which can be combined to offer a range of seating configurations. Additionally, the venue will feature a lobby level complete with a bar, café, terrace, and stage.

@rexarchitecture @davisbrodybond @silman.structural @brookfieldproperties @theportauthority_ny_nj @cimolai_group @stonebridgeerectors @jarosbaumbolles @mka_inc @long_island_concrete @granoguli

#ronaldoperelmanperformingartscenter #construction #nyc #wtc #menatwork #downtown #wip #jobsite #facade
...

170 2

Dramatic footage of a facade panel being lifted into place and installed at The Studio Museum in Harlem (@studiomuseum).

Architects: @adjayeassociates @cooperrobertsonpartners

📹: @aaronthompsonphoto

#wip #underconstruction #harlem #museum #facade #installation
...

109 2

Remembering the lives lost and the lives forever changed on this day 21 years ago… Never Forget 🇺🇸

Photo of our scaffolding at the Times Square Toys”R”Us job site taken in 2001 shortly after 9/11 attack.

#neverforget #911 #september11 #nyc #newyorkstrong #sciame_toysrus
...

90 8