Location
433 West End Avenue

Completion
2004

Client
Calhoun School

Square Footage
30,000 SF

Architect
FXCollaborative

Calhoun School

Sciame was the Construction Manager responsible for the two-phased renovation and addition above the existing school. Phase I included a 6,000 SF extension at the back of school and structural / MEP provisions for Phase II. In addition, Phase II also required 3 new floors over the existing roof. The Calhoun school remained operational during all construction phases.

If you see a crowd staring at the sky, don’t panic, they’re just admiring Fifth Avenue’s ultimate accessory, Stacked Trunks, brought to you by Louis Vuitton. ...

175 6

We at Sciame Construction are thrilled to extend our heartfelt gratitude to our amazing staff who not only cheered on but also fearlessly accepted and triumphantly completed the 3.5-mile J.P. Morgan Corporate Challenge. Thank you once again for your participation and support. #jpmcc ...

130 2

The Perelman Performing Arts Center will provide versatile layouts across three theater spaces, which can be combined to offer a range of seating configurations. Additionally, the venue will feature a lobby level complete with a bar, café, terrace, and stage.

@rexarchitecture @davisbrodybond @silman.structural @brookfieldproperties @theportauthority_ny_nj @cimolai_group @stonebridgeerectors @jarosbaumbolles @mka_inc @long_island_concrete @granoguli

#ronaldoperelmanperformingartscenter #construction #nyc #wtc #menatwork #downtown #wip #jobsite #facade
...

208 5

Dramatic footage of a facade panel being lifted into place and installed at The Studio Museum in Harlem (@studiomuseum).

Architects: @adjayeassociates @cooperrobertsonpartners

📹: @aaronthompsonphoto

#wip #underconstruction #harlem #museum #facade #installation
...

128 2